PlanPhilly

Articles

You are viewing 18 articles with the tag PennDOT by the author Jim Saksa

    • I-95 construction, 2016 | Michael Klusek, EOTS Flickr Group

PennDOT Secretary hopes to connect the planning dots with new initiative

PennDOT Secretary Leslie Richards is a planner, in the professional sense of the word. That slightly unusual fact—most of her predecessors had traffic engineering backgrounds—helps explain her excitement for the…

    • Kite and Key / Emma Lee

Proposal to transform base of Ben Franklin Bridge trips at the start

A few years ago, planners from the Pennsylvania Horticultural Society (PHS) approached the Delaware River Port Authority (DRPA) with an idea: Monument Plaza, the barren concrete pedestal for Isamu Noguchi’s sometimes…

    • Indego bike share

PennDOT gives 13 bicycle and pedestrian infrastructure projects in Greater Philadelphia $9.3M

PennDOT announced the award of $33 million in federal grants to fund 51 transportation projects primarily aimed at initiatives improving pedestrian and bicycle infrastructure. Southeastern Pennsylvania won 13 of those federal…

    • Some day these stairs from the South Street Bridge will connect to a new trail segment extending southward to Christian Street.

Schuylkill River Trail extension to Christian Street fully funded, as Philadelphia wins $4.6 million in state transportation grants

PennDOT announced the award of its Multimodal Transportation Fund (MTF) grants late last week, and Philadelphia will get four totaling $4.6 million. The MTF was created in 2013 by Act 89,…

    • Uber's self-driving cars are being tested in Pittsburgh, August 2016  (AP Photo/Jared Wickerham)

As PennDOT prepares for driverless vehicles, other state agencies stall

On Wednesday, Uber began publicly testing its autonomous vehicle technology, offering free rides to passengers in Pittsburgh who let a computer take the wheel. It’s a major achievement for Uber, which…

    • Digital sign on top of Lit Brothers building | Michael Klusek, EOTS Flickr group

Philadelphia loses last bit of control over city’s billboards [updated]

The Federal Highway Administration (FHWA) revoked Philadelphia’s last bit of control over billboards in the city, transferring jurisdiction for outdoor advertising in the Market Street East Advertising District (MSEAD) to PennDOT.…

    • Map of Roosevelt Boulevard and surrounding area

Mayor Kenney kicks off latest round of Roosevelt Boulevard planning. Will it be the last?

Jim Kenney invited the press to the Mayor’s Reception Room Wednesday afternoon to announce the launch of a 3 year, $5 million “Route for Change” study to make Roosevelt Boulevard a…

    • University City District's popular Porch would see continued improvements under the 30th Street Station District Plan

30th Street Station District Plan unveiled to excitement and ambivalence

On Wednesday night the freshly unveiled draft of the 30th Street Station District was put before the the public, once again seeking input. The North Concourse buzzed with excitement as Karl…

    • Diagram of Winter Street Realignment

Franklin Institute getting new bus loading zone, plaza in Winter Street realignment

The mention of winter usually conjures up images, cold and colorless, of a city depressed: gray, bare trees, lumps of dirty snow, drab coats trudging by with downcast eyes on the…

    • PennDOT plowing Interstate 81, 2010 | (AP Photo/Carolyn Kaster)

What's been plowed? Now you can know

With winter storm Jonas threatening to dump more than a foot of snow on the region, drivers who can’t heed “just stay home” advice from public officials will want to know:…

    • Radar Speed Sign

Streetsplainer: Do radar speed signs ever really slow drivers down?

You’ve seen them on trailers next to construction zones on the highway, permanently affixed to traffic poles near schools, and perhaps on the street next to the office. Radar speed…

    • One of the new Amtrak Cities Sprinter ACS-64 locomotives, Photo courtesy of Amtrak

Amtrak, PennDOT to add a train and speed up another on Keystone service

PennDOT and Amtrak announced schedule changes to the Keystone service line that runs between Harrisburg and New York City with a major stop in Philadelphia. Amtrak will add a new eastbound…

    •  15 Trolley, 15th and Girard | Theresa Stigale

Who owns the streets of Philadelphia? It’s complicated...

Who owns the streets of Philadelphia? If you were like me, you would probably say, “Bruce Springsteen” and grin smugly, as though this wasn’t the millionth time someone made…

    • Manhole covers will be reset before resurfacing.

PennDOT to resurface 22 miles of Philly streets starting July 6

Summer construction season is in full swing around Philadelphia, and PennDOT is about to dive in. PennDOT announced Wednesday evening that  will start repairing and resurfacing 22 miles of Philadelphia interstate…

    • PennDOT has announced 86 new and increased bridge weight restrictions in the five-county region

PennDOT launches public outreach for 2017 12-Year Program

PennDOT is kicking off its biannual update to its Twelve Year Program, which is not to be confused with a twelve-step program. While the TYP and the similarly named, much…

    • Leslie Richards

Tom Wolf picks MontCo Commissioner and DVRPC Chair Leslie Richards to head PennDOT

Governor-elect Tom Wolf announced today his choice for Department of Transportion secretary: Montgomery County Commissioner and Delaware Valley Regional Planning Commission Chair Leslie Richards. She will need to be confirmed by…

    • The Streets Department plans to replace the bridge beginning late next year

P3 project to replace 558 PennDOT bridges starting this summer

PennDOT has finalized the contract terms for its $899 million Rapid Bridge Replacement project with Plenary Walsh Keystone Partnership. With the legal details set and contracts signed, construction to replace 558…

    • After 40th Street Bridge construction ends, work on the 41st Street Bridge will begin in late 2013

Year-end update on Streets Dept. capital projects

Broad Street – Avenue of the Arts North:  This $8.7 million project to install around 50 light towers on Broad Street’s median from Spring Garden to Temple’s campus is moving…

Logging in via Facebook

Log in

Subscribe to our mailing list

* indicates required
Which weekly emails would you like to receive?